Follow Us:

786-235-8534 | info@cdrmaguire.com

 

Bridge replacement Route 9 over Sudbury River (Framingham, MA)

Bridge replacement Route 9 over Sudbury River (Framingham, MA)

MassDOT selected CDR Maguire to provide permitting, preliminary and final design, and construction phase services for this single-span, non-redundant steel plate girder and floor beam structural system supporting a reinforced concrete deck.

The company saved MassDOT millions of dollars by implementing a construction staging procedure that reduced property takings and construction time.