ROUTE 9 BRIDGE OVER FOSS RESERVOIR OUTLET (FRAMINGHAM, MA)

ROUTE 9 BRIDGE OVER FOSS RESERVOIR OUTLET (FRAMINGHAM, MA)

Designed by CDR Maguire and currently under construction, the existing bridge is 56’-10” span steel stringer with cast-in-place concrete deck carrying Route 9 over the Foss Reservoir Outlet in Framingham, MA. The existing bridge will be replaced by a 90-foot span rolled steel beam bridge with composite deck and integral abutments.

 

The challenge for the design and construction is to maintain the 4-lane traffic and pedestrian access during construction and the replacement bridge has to be within the existing bridge footprint to avoid property taking.